
Event Title: Your Factory Doesn’t Lack Manpower — It Lacks Scheduling : Building Zero-Wait Production Rhythm
Date: Thursday, January 8, 2026
Time: 14:00–15:00 (entry opens at 13:50)
Format: Webinar
Registration Deadline: Tuesday, January 6, 5:00 PM
◎Note:This webinar will be conducted in Chinese.
If you require an English version of the presentation or related materials, we will be happy to arrange it for you. Please feel free to contact us.
Agenda
- Why do production lines always get slowed down by bottlenecks?
Analyze the root causes that traditional scheduling cannot solve—rush orders, inserted jobs, material waiting, micro-stoppages, and more. - Scheduling ≠ Filling in a spreadsheet: Manual scheduling will never keep up with change
From Excel and whiteboard scheduling to APS: How intelligent scheduling engines calculate the shortest waiting time, optimal loading, and the most stable production rhythm in real time. - Case Study: Breaking the cycle of “waiting, stagnation, firefighting” with APS
Real examples of bottleneck early warnings, automatic rescheduling for inserted orders, and improved utilization of manpower and equipment.
★Who Should Attend:
- Managers seeking to improve capacity utilization and delivery accuracy
- Supervisors responsible for scheduling, dispatching, and production management
- Companies struggling with bottleneck processes, excessive overtime, or long waiting times
- Department heads in production, planning, materials, procurement, QA/QC, equipment, and IT
- Decision makers planning to adopt APS/MES to build intelligent scheduling capabilities


